Designing HPE Aruba Campus Access Solutions 23.312 (DCAS)

 Welcome to this week's class (DCAS)


Be sure you have downloaded the course learner guide as per the instructions you received in an email from HPE last week.  Check your email history, spam folder, etc... for the keyword "OnSecure" if you cannot find the email.  You only have 10 days to print this learner guide (PDF or paper).
      • in this spreadsheet, you will find the links for:
        • Lab guide (Scenario - Lab 1)
        • Lab guide (full guide, use after you complete Lab 1)
        • Lab worksheet (within, record your answers for most lab questions)

        Class Preparation Notes

      • Although there is a remote lab, you may not need to use it for this class, you can set up the required software on your own computer. You will need:
      • IRIS:
        • as a partner or employee you should already have this, if not:
          • your company domain name should be whitelisted for IRIS
          • this means you can go to www.intangi.com/register.php, register and login using your own partner email address, then download/install iris.
          • if your partner company is not registered with iris, one time only, a representative of your company must email irisaccess@hpe.com giving them your:
            • partner name
            • partner country
            • partner source account id (aka: location id)
        • alternatively use the copy installed in the remote lab
        • after you login to Intangi, visit their video tutorial site, there is some very good training available to augment the instructions provided to you in the lab guide
          • recommended video watch list order
            • 1: Get to Know Iris
            • 2: Configure a Product
            • 3: Connecting Products
            • 4: Design groups
            • 5: Connection dialog
            • 6: Topology & Mapping
            • the rest of them
        • Central Floor Plan
          • you have been provided an account during the lab access time period
          • you can use your own account, otherwise 90 day evaluation accounts are available

      Tips on how to google our site for documentation

        • googling for AOS-Switch related topics
          • site:hpe.com 16.09 -inurl:pdf -inurl:cx "dhcp-snooping"
        • googling for AOS-CX related topics
          • site:arubanetworks.com -inurl:pdf inurl:AOS-CX inurl:10\.11 "dhcp-snooping"
        • googling for Aruba Central related topics
          • site:arubanetworks.com inurl:latest "802.11.k"
        • search option notes:
          • site:x only searched that domain
          • -inurl:x don't report links with this text in the URL
          • inurl:x only report on links with text
            • (ideal for finding specific version documentation)

              Helpful Links

        • about Aruba training and this course

        • where to find more information

        • where to find online documentation

        • AOS-CX specific links

          • AP Datasheets

              • GW Datasheets

            Day 1 - Lecture Modules & Labs

            M00: Course Introduction

                • Lab 0 - Testing Lab Connectivity
                  • 0.1: Access to the Remote Lab Virtual Machine for IRIS
                  • 0.2: Accessing IRIS

              M01: Information Gathering

                • Lab 1 - Determine Customer Requirements

                  • 1.1: Review the initial scenario for Westerburg High
                  • 1.2: Determine Key Stakeholders
                  • 1.3: Summarize the existing network
                  • 1.4: Summarize Site Specifics
                  • 1.5: Collect User and Device Details

              M02: ESP Architecture

                • Lab 2 - ESP Campus Design
                  • 2.1: Create an Updated Campus Network Logical Topology
                  • 2.2: Summarize Building Attributes
                  • 2.3: Initial campus setup with Central Floor Plan
                  • 2.4: Create a site using IRIS
                  • 2.5: Add Aruba Central Cloud Licenses

                    Day 2 - Lecture Modules & Labs

                    M03: RF Planning

                        • slide errata:
                          • slide title = WLAN RF planning process
                            • Step 5 says:
                              • "Finalize Visual RF Plan"
                            • should say:
                              • "Finalize Central Floor Plan"

                    M04: Wireless High-Density Design

                            • Lab 4 - Wireless Very-High-Density
                              • 4.1: Note Potential Areas of Non-Spatial Reuse
                              • 4.2: Determine what AP model(s) for VHD
                              • 4.3: Update Floor Plan in the Tower building floor 1
                              • 4.4: Update your BOM in IRIS

                          Day 3 - Lecture Modules & Labs

                          M05: Wired Network Design

                              • slide errata:
                                • slide title = Aruba CX 6400 switch series
                                  • says:
                                    • only supports class 6 power and up to 5 GbE SR
                                  • should say:
                                    • now supports class 8 power and up to 10 GbE SR

                            • Lab 5 - Wired Network Design
                              • 5.1: Review existing customer cabling
                              • 5.2: Interconnect Closets and Add AP Drops
                              • 5.3: Choose Switches for core/Aggregation/Access
                              • 5.4: Use IRIS to update the existing BOM
                              • 5.5: Establish external connectivity

                                M06: Network Segmentation

                                  • Lab 6 - Network Segmentation
                                    • 6.1: Evaluate the Current Network Segmentation Design
                                    • 6.2: Update the Network Segmentation Design
                                    • 6.3: Recommend Address Efficiency Technologies

                                Day 4 - Lecture Modules & Labs

                                M07: Campus Security

                                    • slide errata:
                                      • slide title = ClearPass policy manager
                                        • suggests that CPDI is part of CPPM
                                        • however, this is a separate product that could be integrated along side of CPPM
                                      • slide title = Profiling with Central Device Insigts
                                        • says CPDI requires sensors, however, it is more accurate to say that it requires an the CPDI appliance or OVA

                                  • Lab 7 - Campus security
                                    • 7.1: Implement Authentication with CPPM
                                    • 7.2: ClearPass OnGuard & OnBoard
                                    • 7.3: Update Your Licenses in IRIS 

                                M08: Overlay Networks

                                    • slide errata:
                                      • slide title = Application classificatino
                                        • says:
                                          • that network control and voice and video are the top 3 app classifications, this is an outdated standard
                                        • should say:
                                          • network control is queue 8, internetwork control is queue 7, voice is queue 6, video is queue 5

                                  • Lab 8 - Overlay Networks and Gateways
                                    • 8.1: Determine Overlay Requirements
                                    • 8.2: Update IRIS 

                                    M09: Network Optimization Design

                                      • Lab 9 - Network Optimization Design
                                        • 9.1: Answer QoS Concerns
                                        • 9.2: Install UXI Sensors

                                    Appendix

                                    • Acronyms or Key terms
                                      • placeholder
                                    • Troubleshooting Tips
                                      • placeholder

                                    Comments

                                    Popular posts from this blog

                                    Arubanetworks Webgate - Copy and Paste instructions

                                    Instructor PPTX VBA - Standardize the PPTX Slide Deck "Title" position, font, width and other formatting settings